SAMPLE TRUCK WASH PRICING
THE FOLLOWING PRICES SHOW A TYPICAL TWO BAY, 100’
X 50’ TRUCK WASH FACILITY WITH IN A ONE DAY DRIVE AREA OF SASKATOON.
THIS WILL PROVIDE BUDGET PRICING FOR THE SUPPLY AND INSTALL OF TWO TRUCK
BAYS, WHICH IS USUALLY 4 PUMPS, 8 GUNS / WANDS. WATER HEATERS, SOFTENERS
AND/OR SPOT FREE RINSE SYSTEM IS EXTRA. WE WILL REQUIRE DETAILED PLOT
DRAWINGS TO PROVIDE A FORMAL QUOTATION FOR YOUR SPECIFIC REQUIREMENTS.
EQUIPMENT TO BE SUPPLIED AND SCOPE OF INSTALLATION, IS
AS FOLLOWS;
OPTIONAL EXTRA
INSTALLATION INCLUDED;
SUPPLY AND INSTALL ½” STAINLESS STEEL TUBING
AND RELATED FITTINGS TO RUN FROM PUMP OUTLETS TO EACH BAY LOCATION.
SUPPLY AND INSTALLATION OF ¼ STAINLESS STEEL CABLE
ASSY C/W SLIDER BRACKETS
TO PROVIDE FESTOONING OF HIGH PRESSURE LINES FROM CENTER OF EACH BAY
TO
EACH END AND ON BOTH SIDES.
SUPPLY AND INSTALLATION OF LOW PRESSURE POLLY TUBE FOR
FOAM BRUSH AND
TIRE/ENGINE CLEANER SYSTEMS.
SUPPLY AND INSTALLATION OF LOW VOLTAGE, PVC JACKETED CONTROL
WIRE, TO
RUN FROM OUR CONTROL PANEL TO SWITCH IN WASH BAY AND CONTROLS IN OFFICE.
CUSTOMER INSTALLATION REQUIREMENTS;
WE WILL REQUIRE CONDUIT TO BE INSTALLED IN WASH BAY AREA
TO RUN FROM SWITCH ENCLOSURE TO OUR MOTOR STARTER PANEL IN EQUIPMENT
ROOM. THIS CAN
BE EITHER INSTALLED IN FLOOR, PRIOR TO CONCRETE, OR SURFACE MOUNTED.
WE MAY ALSO BE ABLE TO INSTALL IN WALLS, WITH OUT CONDUIT IF BUILDING
DESIGN ALLOWS.
A STURDY CONNECTION WILL BE REQUIRED ON EACH SIDE , AND
AT THE FRONT, REAR
AND CENTRE OF EACH WASH BAY. THIS WILL ENABLE US TO ATTACH OUR FESTOONING
CALBE TO EACH SIDE OF EACH WASH BAY AND TIGHTEN WITH THE TURNBUCKLE.
AN ACCURATE MEASUREMENT WILL BE NEEDED FOR THE LENGTH OF CABLE REQUIRED.
AN ELECTRICIAN WILL BE REQUIRED TO PROVIDE BREAKERS AND
CONNECTIONS FROM
OUR MOTOR STARTER PANEL TO CUSTOMERS BREAKER PANEL.CONDUIT WILL ALSO
BE REQUIRED FOR THE INSTALLATION OF THE OPTIONAL WASH CARD SYSTEM.
IT IS IMPORTANT TO PROVIDE SUFFICIENT BACKING AND MOUNTING
AREAS FOR OUR
EQUIPMENT AS IT IS BEING INSTALLED INTO WASHBAYS. WE WILL COORDINATE
WITH BUILDER, BUT PROVISIONS NEED TO BE CONSIDERED FOR MOUNTING OF SWITCHES,
WAND HOLDERS, MAT CLAMPS, FOAM BRUSH HOOKS, ETC.
PANTHER WASH EQUIPMENT WILL NOT DO ON SITE MANUFACTURING
OF BRACKETS OR BRACES TO ACCOMMODATE OUR INSTALLATION REQUIREMENTS.
COMPUTERS, PRINTERS AND OTHER PERIPHERAL ITEMS THAT MAY
BE REQUIRED FOR THE WASH CARD SYSTEM
ARE EXTRA.
TERMS
GST/PST EXTRA
FOB SITE.
2 – 4 WEEK DELIVERY FROM RECIEPT OF DEPOSIT
25 % DEPOSIT REQUIRED WITH ACCEPTED OFFER
65 % BALANCE DUE UPON COMPLETION OF INSTALLATION
10 % BALANCE DUE 30 DAYS FROM START UP
THANK YOU FOR THE OPPORTUNITY OF QUOTING, WE REMAIN,
YOURS TRULY,
KELLY WILKINSON