THE IN-BAY ITEMS REQUIRE SUFFICIENT STRUCTURE FOR THEIR PROPER MOUNTING. COIN BOXES AND WAND HOLDERS REQUIRE BACKING BEHIND WALL PANELS TO PROVIDE A STURDY MOUNTING POINT. FOAM BRUSH BOOMS, AND BRUSH HOOKS ALSO MUST BE CONSIDERED.
INSTALLATION OF OVERHEAD BOOMS WILL REQUIRE A SUBSTANTIAL MOUNTING POINT IN CENTRE OF BAY AT CEILING. IT IS IMPORTANT TO CONSIDER LOCATION OF HEATERS, LIGHTS, DOORS, AND OTHER OBSTRUCTIONS, THAT MAY INTERFERE WITH MOUNTING.
CONTROL WIRE TO COIN METERS MAY BE INSTALLED THROUGH WALLS, TO
EQUIPMENT ROOM, IF CO-ORDINATED DURING BUILDING CONSTRUCTION. IF WIRE IS TO
BE SURFACE
MOUNTED, AN ELECTRICIAN WILL BE REQUIRED TO INSTALL CONDUIT, FROM COIN METERS,
TO EQUIPMENT ROOM.
AN ELECTRICIAN WILL BE REQUIRED TO SUPPLY AND INSTALL BREAKER PANEL AND BREAKERS AND PROVIDE HI-VOLTAGE CIRCUITS TO OUR STARTER PANEL FOR MOTOR OPERATION AND PROVIDE POWER TO OUR CONTROL TRANSFORMER.
A PLUMBER WILL BE NEEDED TO PROVIDE HOT AND COLD , SOFT WATER
TO A LOCATION ON WALL, NEAR OUR TANK PACKAGE. A DETAIL OF VALVES AND MISC. HOSE
BIBS CAN BE PROVIDED.
IF DESIRED, CUSTOMER MAY INSTALL OUR EQUIPMENT ON THEIR OWN, WITH OUR INSTRUCTION.
WE WILL PROVIDE DETAILS NEEDED ON EQUIPMENT LAYOUT AND MOUNTING. WE CAN ALSO
BE AVAILABLE AT SITE, PRIOR TO START-UP AND CAN ASSIST IN FINAL CONNECTIONS
AND PROVIDE START UP ASSISTANCE.
PANTHER WASH EQUIPMENT WILL NOT DO ON SITE MANUFACTURING
OF BRACKETS OR
SUPPORT ITEMS REQUIRED FOR INSTALLATION OF OUR ITEMS IN BAY.